Current Traffic Impacts
Motorists are advised that there will be nightly lane closures on both I-95 southbound and northbound from 8:00 p.m. to 5:00 a.m. (Sunday through Thursday). Project limits are from Exit 74 to exit 75.
Current Project Activities Include:
I-95 Exit 74 Southbound On/Off Ramp
- Installation of fill material in areas of proposed on-ramp
- Form and pour drainage headwall
- Seeding of slopes and erosion control matting
I-95 Exit 74A Northbound On-Ramp
- Fire hydrant extension
Frontage Road / Temporary Reuse Soil Area (TRSA)
Installation of temporary signal precast
- Installation of bituminous curbing and driveway aprons
DOT Access Road
- Installation of upper temporary earth retaining system (TERS) for temporary DOT access road
- Installation of lower TERS for temporary DOT access road
- Blasting at DOT access road
- Rock excavation
- Installation of temporary/permanent drainage
- Excavation of existing roadway for wall W111
- Relocation of IMS cabinet
- Installation of soil nail TERS