Construction Photos / Videos
- I-95 Southbound Exit 75 Entrance Ramp Improvements
- New Exit 74 Off-Ramp (Northbound) Drone Video
- Existing Condition Photos
- Monthly Project Photos
- Project Aerials
- Interactive 3D Project Model
- Blasting Videos
- Retaining Walls
- Enhancement of Latimer Brook Culvert
- I-95 Northbound New Roadway Alignment - Opened December 9, 2024
- Construction Schedule
- Contact Us
March 2025








October 2024


Bridge 0250 Galvanized Rebar


Wingwall 2B - Removal of Formliner

Abutment 2 Cheekwall & Backwall Concrete Placement

Abutment 2 Damp-proofing & Pervious Structure Backfilling

Abutment 2 Backwall

Abutment 2 Working Platform Cables

Working Platform Installation

Bridge 0250 Abutment 2 TERS (Temporary Earth Retaining System)


Bridge 0250 Abutment 2 Cheekwall Formwork


Bridge 0250 Abutment 2, Stage 2


Bridge 0250 I-95 Northbound Exit 74 On-ramp

Bridge 0250 Stage 2 SIP Installation

New On-ramp to I-95 Northbound (at Exit 74)
September 2024





Structure Excavation Slide Rail


Bridge 250 Wingwall 2B Formliner

Latimer Brook

Latimer Brook
-2.jpg)
Latimer Brook

Latimer Brook

Latimer Brook

Latimer Brook

Latimer Brook








-2.jpg)

-2.jpg)

July/August 2024


Retaining Wall 115 - DoubleWal Installation

Bridge 251 South Barrel Closure Pour Formwork

Bridge 251 Latimer Brook South Barrel Outlet

Bridge 251 South Barrel Wingwall

Latimer Brook Concrete Weir Installation

Bridge 251 South Barrel Closure Pour Concrete Placement

Bridge 251 Outlet Latimer Brook - Overall View

Latimer Brook Outlet

Bridge 251 - Overall View

Latimer Brook Excavation for Concrete Weir

Bridge 251 Overall View

Latimer Brook Outlet - Overall View

Latimer Brook Outlet Overall View

Retaining Wall 115 Leveling Pad South Side

Standard Riprap Bridge 251 Latimer Brook Outlet

Bridge 251 Latimer Brook Existing Apron Removal

Bridge 251 Latimer Brook South Barrel Sandbag Installation













-2.jpg)
















-2.jpg)

-2.jpg)



June 2024


I-95 Southbound Entrance Ramp at Exit 75

I-95 Southbound Entrance Ramp at Exit 75 - Southbound View

I-95 Southbound Entrance Ramp at Exit 75 - Northbound View

Abutment 2 TERS (Temporary Earth Retaining System) Repair



Bridge 0250 Abutment 1 Stage 2 Section

Bridge 0250 Abutment 1 Stem

Bridge 0250 Wingwall 1B
May 2024


Retaining Wall 115 - North Side Structure Excavation

Latimer Brook

Retaining Wall 115 - North of Latimer Brook

Retaining Wall 117 - Underdrain Installation

Retaining Wall 117 - DoubleWal West Side

Retaining Wall 115 - South Side Structure Excavation

Retaining Wall 112 - I-95 Southbound Shoulder

Retaining Wall 112

Retaining Wall 117 - Granular Fill Backfill

Anti-tracking Pad

Retaining Wall 115 Soil Nail Wall Installation (North Side Corner to Bridge 251)

Temporary Drainage

Retaining Wall 112

Slip Sleeve

Retaining Wall 117 - Leveling Pad

Silt Fence Installation

TERS Wire Installation

South End Temporary Drainage

Retaining Wall 155 - Backfilled Corner of Bridge 251

Bridge 250 - Stage 2 Pour

Bridge 250 Abutment 1 - Stage 2 Pour

Bridge 250 Abutment 1 - Stage 2 Pour

Bridge 250 Abutment 1 - Stage 2 Stem Forms

Bridge 250 Abutment 1 - Stem Formwork

Bridge 250 Abutment 1 - Stem Formwork

Bridge 250 Abutment 1


Bridge 250 Abutment 1 - Stage 2 Footing Curing

Retaining Wall 116 - Micropile Grouting
April 2024


Retaining Wall 116 - Group Plant

Retaining Wall 116 - Group Plant Micropile

Retaining Wall 116 - Leveling Pad Formwork

Retaining Wall 116 - Leveling Pad Restoration
March 2024


Retaining Wall 103

Retaining Wall 103

Retaining Wall 105

Retaining Wall 105

Retaining Wall 105

Retaining Wall 105 - Removal of Slide Rail System

Retaining Wall 105 - Granular Fill












January / February 2024


Retaining Wall 101 - Site 1 - Galvanized Rebar Moment Slab

Retaining Wall 101 - Pervious Structure Backfill Parapet

Retaining Wall 101 - Formation of Subbase

Retaining Wall 101 - Site 1 - Processed Aggregate Base

Retaining Wall 101 - Site 1 - Formation of Subbase and Processed Aggregate Base

Site 3 DoubleWal

Retaining Wall 103 - Site 3 DoubleWal

Retaining Wall 103 - Site 3 DoubleWal Granular Fill

Retaining Wall 103 - Site 3 Overall View

Retaining Wall 105 - Site 5 Slide Rail System

Retaining Wall 105 - DoubleWal Installation

Bridge 2585 Box Culvert Inlet

Bridge 2585 Box Culvert Inlet

Cofferdam and Dewatering
November 2023


















Box culvert outlet relief slab concrete placement




















October 2023


Double Wall Installation

Earth Excavation Retaining Wall 106

Retaining Wall 104 Double Wall Installation

Retaining Wall 106 Standing Water prior to Concrete Placement Leveling Pad

Retaining Wall 106 Leveling Pad Concrete Placement

Maintenance of Check Dam in Swale

Retaining Wall 104 Slide Rail System

Earth Excavation for Existing Billboard Removal

Retaining Wall 106 Pervious Structure Backfill Placement

Retaining Wall 106, Site No. 6

Retaining Wall 104, Site No. 4

Retaining Wall 106 Concrete Leveling Pad Formwork

Plate Compactor for Pervious Backfill Retaining Wall 106

Retaining Wall 106 Concrete Leveling Pad Placement

Retaining Wall 105 Temporary Access Road: Earth Excavation and Borrow Placement

Bridge 2585 Culvert Outlet Extension

Bridge 2585 Culvert Outlet Extension: Removal of Sheet Piles

Bridge 2585 Culvert Outlet Extension: Intermediate Rip Rap

Bridge 2585 Culvert Outlet Extension: Streambed Material Placement

Bridge 2585 Culvert Outlet Extension: Streambed Material Placement

Retaining Wall 105: Overall View of Temporary Access Road

Precast Parapets
September 2023


Bridge 2585 Culvert Karnak 108 Asphalt Primer Roller Application

Cofferdam


Granular Fill Double Wall - Retaining Wall 106


Dewatering of Cofferdam

Retaining Wall 3

Retaining Wall 2


New Exit 74 Off-Ramp

Retaining Wall 106


Culvert Barrel Installation



August 2023


-2.jpg)









July 2023


Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Line Striping for New Temporary Commuter Lot



Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Paved New Temporary Commuter Lot

Line Striping for New Temporary Commuter Lot




May / June 2023


Line Striping on I-95 NB

Rumble Strip Removal and Line Striping on I-95 NB, Exit 74

Earth Excavation (Flanders Road/I-95 NB)

I-95 NB, Exit 74 Swale (drainage area)

Earth Excavation Swale, I-95 NB, Exit 74

I-95 NB, Exit 74 Swale

Overview of Waste Stockpile Area (WSA)


April 2023


Flanders Road Route 161
.jpg)
Flanders Road Route 161
.jpg)
Earth Excavation on Flanders Road (Route 161)
.jpg)
Earth Excavation on Flanders Road (Route 161)

Earth Excavation Material to TRSA - Flanders Road (Route 161)
.jpg)
Clearing and Grubbing - Flanders Road (Route 161)
.jpg)
Earth excavation for roadway widening and utility pole relocation - Flanders Road (Route 161 NB)

Earth excavation for roadway widening and utility pole relocation - Flanders Road (Route 161 NB)

Wattle environmental controls installed along curb line - Flanders Road (Route 161)

Rock Excavation - Flanders Road (Route 161)

Rock Excavation - Flanders Road (Route 161)
.jpg)
Earth Excavation Material to TRSA - Flanders Road (Route 161)
.jpg)
Earth Excavating - Flanders Road
.jpg)
Wattle environmental controls installed along curb line - Flanders Road (Route 161)
.jpg)
Earth Excavation Material to TRSA - Flanders Road (Route 161)
.jpg)
Excavating Flanders Road (Route 161)

Rock Excavation - Flanders Road (Route 161)

.jpg)
Clearing and Grubbing - Flanders Road (Route 161)
.jpg)
Clearing and Grubbing - Flanders Road (Route 161)